Mokambo Project - Near Surface Drill Results Update - Cobalt Identified
Abbotsford, Canada (ots/PRNewswire)
ICS Copper Systems Ltd. (ICX:TSX.V) is pleased to announce new assay results on their Mokambo Project situated in Mufulira, Zambia. The 2007-2008 shallow drilling program is 70% complete with respect to the initial delineation drill program. Assay results are still backlogged and cover only 25% of the drill program. The backlog is presently being reduced as quickly as possible. The limited results though, have identified some large intersections of copper. Along with the copper, significant cobalt mineralization has also been identified. Highlights include drill road number 6 showing 3.143% copper over 4.58 meters, 1.23% copper over 13.82 meters, 0.301% copper over 41.42 meters and 0.036% cobalt over 3.67 meters.
The drill program has 20 roads, assay results for roads 7 onwards will be released in due course once assay results are known.
Road Number 2 Hole No. From To Interval Copper Cobalt (m) (m) (True Width m) (%) (%) M-07-07 37.15 38.15 0.91 0.840 87.15 90.15 2.72 0.059 including 87.15 88.15 0.91 0.014 M-07-08 44.10 50.20 5.53 0.116 56.30 102.80 42.14 0.149 including 80.70 88.80 7.34 0.021 M-07-09 15.60 17.65 1.86 0.062 0.015 M-07-10 32.90 34.95 1.86 0.013 38.00 44.10 5.53 0.025 including 38.00 41.05 2.76 0.110 M-07-11 61.35 62.40 0.95 0.058 M-07-12 28.85 30.85 1.81 0.060 44.10 50.20 5.53 0.092 56.30 73.05 15.18 0.072 Road Number 3 Hole No. From To Interval Copper Cobalt (m) (m) (True Width m) (%) (%) M-07-13 26.00 27.00 0.91 0.056 M-07-14 25.80 53.20 24.83 0.163 including 28.85 34.95 5.53 0.013 55.85 58.90 2.76 0.055 65.00 66.00 0.91 0.150 81.25 84.30 2.76 0.099 86.35 87.35 0.91 0.120 98.55 112.80 12.91 0.207 M-07-16 46.10 47.15 0.95 0.025 M-07-18 19.70 20.70 0.91 0.010 Road Number 4 Hole No. From To Interval Copper Cobalt (m) (m) (True Width m) (%) (%) M-07-19 20.70 21.70 0.91 0.078 49.70 51.70 1.81 1.830 57.30 58.30 0.91 0.056 63.40 66.45 2.76 0.163 M-07-20 31.90 56.30 22.11 0.076 including 47.15 51.70 4.12 0.127 66.45 70.00 3.22 0.082 75.60 89.85 12.91 0.170 92.90 110.15 15.63 0.170 Road Number 5 Hole No. From To Interval Copper Cobalt (m) (m) (True Width m) (%) (%) M-07-26 33.00 43.00 9.06 0.135 including 35.00 36.00 0.91 0.011 49.00 50.00 0.91 0.070 53.00 59.00 5.44 0.073 74.00 77.00 2.72 0.083 80.00 81.00 0.91 0.100 88.00 117.30 26.55 - EOH 0.132 including 92.00 96.00 3.63 0.280 including 110.00 112.00 1.81 0.011 including 116.00 117.30 1.18 - EOH 0.021 Road Number 6 Hole No. From To Interval Copper Cobalt (m) (m) (True Width m) (%) (%) M-07-31 7.50 8.50 0.91 0.260 50.15 52.15 1.81 0.415 M-07-32 18.70 64.40 41.42 0.301 including 19.70 22.75 2.76 0.018 including 44.10 47.15 2.76 1.330 including 53.25 55.25 1.81 0.011 74.60 94.80 18.31 0.195 including 76.60 80.70 3.72 0.651 98.90 114.15 13.82 1.230 including 105.00 110.05 4.58 3.143 including 105.00 109.05 3.67 0.036 M-07-33 53.25 54.75 1.36 0.056 71.55 73.05 1.36 0.068 85.75 86.80 0.95 0.052 M-07-34 72.55 73.55 0.91 0.055 118.20 120.00 1.63 - EOH 0.650
Several holes were inadvertently stopped in mineralization (i.e. end of hole (EOH). At the end of this phase of drilling, a NI 43-101 Technical Report on the oxide copper and cobalt mineral resources will be undertaken. A further definition drilling program will be undertaken to move the copper and cobalt mineralization into higher (i.e. measured and indicated) categories for mine design purposes and eventual ore reserve estimate under NI 43-101.
A second drill is being sourced to start the confirmation drilling of the sulphide copper mineralization after the rainy season is over, in April. Permission is being sought by the Zambian Chamber of Mines to re-assay the historic drill core they are storing, as part of the confirmation drilling. A 3D computer block model has been constructed from the historic drill logs acquired by the company in 2007. There are several gaps along strike of the mineralized bodies, identified in the block model, that were not historically drilled. ICS plans to drill these areas as soon as possible to increase the present historical estimate.
Mr. Graham Chisholm, President comments "The identification of cobalt in numerous holes is good news and will add value to the profitability of the Mokambo Project."
David Makepeace, P.Eng. M.Eng, a director of the Company and its acting Chief Operating Officer, a qualified person as defined by National Instrument 43-101, supervised the preparation of the technical information in this news release.
ICS COPPER SYSTEMS LTD.
Signed "Graham Chisholm"
Graham Chisholm, President & CEO
This release includes certain statements that are "forward-looking statements". All statements in this release, other than statements of historical facts that address future exploration, development and production activities, and other circumstances, events and developments that the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results, events and developments may differ materially from those in the forward-looking statements. The occurrence of certain risk factors, the probability of which is unknown, may also affect actual results, events and developments expected by the Company.
The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
Web Page: http://www.icscopper.com
Contact:
For further information: Graham Chisholm, graham@icscopper.com,
Office: +1-604-859-3007, Cell: +1-604-302-0746; For Investor
Relations: Brett Whitelaw, brett_whitelaw@telus.net, Tel:
+1-604-662-8633, Web Page: http://www.icscopper.com