Alle Storys
Folgen
Keine Story von ICS Copper Systems Ltd mehr verpassen.

ICS Copper Systems Ltd

ICS Signs Confidentiality and Exclusivity Agreement Re: Sebembere Mine in Zambia

Abbotsford, British Columbia (ots/PRNewswire)

ICS Copper Systems
Ltd. (ICX:TSX.V) is pleased to announce that it has  signed a
confidentiality and exclusivity agreement with Baluba Building
Construction Limited with regard to the small scale mining licence
SML 389  which covers the Sebembere Mine in the Central Province of
Zambia, 21 km  north-west of Kabwe.
The agreement will allow ICS to exclusively conduct due diligence
on the  property until 30th May 2008 at which time ICS, if it
chooses, will have the  exclusive right to enter into a Joint Venture
Agreement with Baluba Building  Construction Limited to develop the
Sebembere Mine.
Mokambo Mine's "Twin"
Similar to ICS's Mokambo Mine in Mufulira, the Sebembere Mine was
developed by the state Romanian company "Geomin" from 1970-1973. The
mine  also sits atop a geological structure named the Sebembere
Syncline and like  Mokambo may have an oxide cap. Geomin conducted a
10,700m drill program  ranging from depths of 52 to 1,070 meters and
sank an exploratory shaft to a  depth of 37 meters.
A geological report on the property prepared by Geomin shows a
historic  estimate of 16.3 million tons with an average grade of
1.61% copper. The  report states that "with additional drilling....it
is considered that the  potential could be raised up to 19-20 million
tons with a copper content of  more than 1.8%". The report also
advises that this "deposit estimate does not  include the
mineralization in the oxidation zone of the deposit".
A report published by Zambian Consolidated Copper Mines (ZCCM) in
August  1992 on the Sebembere Syncline stated "there is abundant
reason to believe  that drilling to investigate the lateral and down
dip extensions to the known  body would result in a significant
increase in the indicated tonnage."
Mr. Graham Chisholm, President & CEO comments "We anticipate the
due  diligence on the property will authenticate title, in which
case, we will  sign a Joint Venture agreement with Baluba Building
Construction Limited.  This will also necessitate the preparation of
a 43-101 report for the British  Columbia Securities Commission."
David Makepeace, P.Eng. M.Eng, a director of the Company and its
acting  Chief Operating Officer, a qualified person as defined by
National Instrument  43-101, supervised the preparation of the
technical information in this news  release.
ICS Copper Systems Ltd.
Signed "Graham Chisholm"
Graham Chisholm, President & CEO
This release includes certain statements that are "forward-looking
statements". All statements in this release, other than statements of
historical facts that address future exploration, development and
production  activities, and other circumstances, events and
developments that the Company  expects, are forward-looking
statements. Although management believes the  expectations expressed
in such forward-looking statements are based on  reasonable
assumptions, such statements are not guarantees of future
performance, and actual results, events and developments may differ
materially from those in the forward-looking statements. The
occurrence of  certain risk factors, the probability of which is
unknown, may also affect  actual results, events and developments
expected by the Company.
The TSX Venture Exchange has not reviewed and does not accept
responsibility for the adequacy or accuracy of this release.
Web Page: http://www.icscopper.com/

Contact:

For further information: Graham Chisholm, graham@icscopper.com,
Office: +1-604-859-3007, Cell: +1-604-302-0746; For Investor
Relations: Brett Whitelaw, brett_whitelaw@telus.net, Tel:
+1-604-662-8633

Weitere Storys: ICS Copper Systems Ltd
Weitere Storys: ICS Copper Systems Ltd
  • 28.01.2008 – 14:38

    Mokambo Project - Near Surface Drill Results Update - Cobalt Identified

    Abbotsford, Canada (ots/PRNewswire) - ICS Copper Systems Ltd. (ICX:TSX.V) is pleased to announce new assay results on their Mokambo Project situated in Mufulira, Zambia. The 2007-2008 shallow drilling program is 70% complete with respect to the initial delineation drill program. Assay results are still backlogged and cover only 25% of the drill program. The ...

  • 04.12.2007 – 22:39

    Mokambo Mine Announces Initial Assay Results

    Abbotsford, Canada (ots/PRNewswire) - ICS Copper Systems Ltd. (ICX:TSX.V) is pleased to announce the initial assay results from the diamond drill core program at the Mokambo Mine situated in Mufulira, Zambia. The best intersections are as follows: Road Number 1 is at the extreme west portion of the concession and at the outer edge of the main oxide copper zone. Hole Number From To ...

  • 30.10.2007 – 17:43

    ICS Clarifies its Disclosure

    Abbotsford, Canada (ots/PRNewswire) - ICS Copper Systems Limited (TSXV: ICX) announces that, as a result of a review by the British Columbia Securities Commission, it is issuing the following news release to clarify its disclosure. Musoshi Tailings Project The project continues to be on hold due to a dispute regarding ownership of the tailings between Sodiminco and MMK. Subsequent to the Company's IPO, it disclosed an unclassified current tailings resource as ...