Richmont Mines Intersects High-Grade, Wide Mineralization in the Down Plunge Extension of the Island Gold Deposit; Including 19.85 g/t Gold Over 8.4 Metres

Toronto (ots/PRNewswire)

Richmont Mines Inc. (TSX: RIC) (NYSE: RIC) ("Richmont" or the "Corporation"), is pleased to provide an update on its strategic exploration drilling program currently underway at the cornerstone Island Gold Mine. Recent exploration drilling has intersected high-grade, wide mineralization in the down plunge extension of the main Island Gold deposit with Hole MH8-4 intersecting 19.85 g/t gold over 8.4 metres (true width).

"Our deep directional drilling further confirms the continuation of high-grade, wide zones located in the down plunge extension of the main deposit and we see significant potential to increase mineral resources at depth. Concurrently, we are very encouraged with the results reported from the eastern lateral extension of the main deposit where we anticipate adding near-mine resources that could be incorporated into the current mine plan," stated Renaud Adams, CEO. He continued, "As our ongoing drilling continues to demonstrate the resource potential of the Island Gold deposit, we remain confident that we will extend the mineralized resource blocks located outside the Expansion Case PEA area with quality high-grade ounces. Over the balance of the year we will continue to advance our disciplined drilling program with an overall focus on identifying the next million ounces of gold resources located outside the PEA."

2017 DRILLING PROGRAM - ISLAND GOLD MINE (Figure 1 (http://files.newswire.ca/1459/2307Fig1-EN.pdf))

The 2017 exploration drilling program, currently underway, continues to build on the positive results achieved in 2016 and is primarily focused on expanding near-mine resources outside the Expansion Case Preliminary Economic Assessment ("PEA") area, both laterally and at depth.

Deep Directional Exploration Drilling Program Highlights (Figure 2 (http://files.newswire.ca/1459/2307Fig2-EN.pdf))

The successful 2016 deep drilling program identified a new large inferred resource block of 760,000 tonnes at a grade of 9.53 g/t gold (containing approximately 230,000 ounces, assays capped at 70 g/t gold) in the down plunge extension, located between the 1,050 and the 1,300 metre levels. The main objective of the 2017 deep directional exploration drilling program is to prove the high-grade extension of the new resource block to a minimum vertical depth of 1,500 metres. Results to date include three significant intercepts (Table 1) (All results are reported with estimated true widths and assays capped at 70 g/t gold.):

- Hole MH8-4 intersected 19.85 g/t gold over 8.4 metres in the 
  eastern portion of the down plunge extension of the deposit. The 
  intersection is located approximately 1,300 metres below surface 
  and includes 71.76 g/t gold over 0.5 metres, 141.43 g/t gold over 
  0.59 metres and 318.28 g/t gold over 0.25 metres.
- Hole MH2A-12 intersected 11.67 g/t gold over 9.42 metres, including
  548.1 g/t gold over 0.24 metres.
- Hole MH2A-13 intersected 8.86 g/t gold over 6.39 metres at a depth 
  of 1,350 metres.

These three new high-grade, wide intercepts confirm that the interpreted down plunge extension of the main Island Gold deposit remains open to a minimum vertical depth of 1,350 metres. Mineralization in this area remains consistent with the main portion of the deposit.

Other highlights from the deep directional exploration drilling include (Table 1):

- Hole MH1-11: 20.78 g/t gold over 1.28 metres (undefined zone)
- Hole MH7: 17.85 g/t gold over 1.68 metres (undefined zone)

Deep directional drilling holes have been completed below the western limit of the Expansion Case PEA area and assays are pending.

Currently, there are three deep directional drills working in the area with a total of 14,059 metres of a planned 36,000 metre drill program have been drilled to date.

Eastern Lateral Infill and Exploration Drilling Program (Figure 3 (http://files.newswire.ca/1459/2307Fig3-EN.pdf))

The 2016 drilling program successfully added two new inferred resource blocks in the eastern lateral extension, located approximately 300 metres east of the Expansion Case PEA area, between the 340 and the 750 metre levels. The largest inferred resource block contains approximately 290,000 tonnes at a grade of 10.35 g/t gold (approximately 95,000 ounces of gold, capped at 70 g/t gold).

Infill drilling is on-going in the upper part of the new resource block from the 340 metre level with encouraging results to date. The extension of the 620 metre level exploration drift is advancing as planned with infill drilling in the lower part of the block expected to begin shortly. Recent highlights from Eastern Lateral infill drilling include (Table 2) (All results are reported with estimated true widths and assays capped at 70 g/t gold.):

- Hole 340-588-30: 14.15 g/t gold over 2.91 metres
- Hole 340-588-40: 23.10 g/t gold over 2.40 metres
- Hole 340-588-45: 14.71 g/t gold over 2.59 metres
- Hole 340-588-50: 12.52 g/t gold over 3.00 metres
- Hole 340-588-52: 16.16 g/t gold over 2.35 metres

Exploration drilling in the eastern lateral extension is focused in the area where hole GD-640-05 intersected 20.57 g/t of gold over a core length of 11.3 metres, at a vertical depth of approximately 1,000 metres. One directional drill rig has been redeployed to this area to follow-up on this intersection to better understand the geometry and true width of this new high-grade mineralization. Highlights of recent drilling include (Table 2):

- Hole GD-640-05-3 intersected 13.81 g/t gold over 5.2 metres (core 
  length) at the same elevation of GD-640-05, but located 40 metres 
  to the east. Results to date indicate a potential flat, high-grade 
  zone with quartz veins.
- Hole GD-640-05-5 intersected a small high-grade zone of 58.34 g/t 
  gold over 0.43 metres in the plane of the E1E Zone.

Another surface drill rig is currently working further to the east, approximately 1,500 metres from the second dike, to test the lateral extension of the main mineralized structure. To date, two small gold zones have been identified, including:

- Hole GD-670-01: 4.17 g/t gold over 2.44 metres
- Hole GD-690-01: 15.39 g/t gold over 0.89 metres

A total of 18,465 metres of a planned 37,000 metres of exploration and infill drilling has been completed to date with two surface drill rigs and one underground drill from the 340 metre level.

Expansion Case PEA Delineation Drilling Program (Figure 4 (http://files.newswire.ca/1459/2307Fig4-EN.pdf ))

For 2017, a total of 30,000 metres of delineation drilling is planned within the Expansion Case PEA area, primarily in the fourth mining horizon located between the 860 and 1,000 metre levels, with the objective of converting inferred resource blocks to reserves. Currently, two drill rigs are working in the area and a total of 8,515 metres has been completed to date. Recent highlights include (Table 3) (All results are reported with estimated true widths and assays capped at 225 g/t gold.):

- Hole 860-511-03: 37.09 g/t gold over 4.98 metres
- Hole 860-511-07: 51.02 g/t gold over 3.54 metres
- Hole 860-517-07: 52.09 g/t gold over 4.99 metres
- Hole 860-517-08: 45.20 g/t gold over 3.27 metres
- Hole 740-465-40: 31.80 g/t gold over 1.92 metres

Exploration drilling is also underway within the Expansion Case PEA area with the objective of adding resources between the current resources blocks. Recent drilling highlights include:

- Hole 740-465-25: 87.64 g/t gold over 4.90 metres (undefined zone)
- Hole 740-465-29: 49.15 g/t gold over 4.19 metres (undefined zone)

Qualified Persons

The scientific and technical content and interpretations contained in this news release have been reviewed, verified and approved by Daniel Adam P.Geo., Ph.D., Richmont's Vice-President, Exploration, a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). For additional information about prior drilling results, refer to the Corporation's technical report titled "Island Gold Mine Technical Report and Expansion Case Preliminary Economic Assessment, Dubreuilville, Ontario, Canada" dated July 13, 2017 with an effective date of May 29, 2017.

Quality Control

Assays for the diamond drilling programs were done at LabExpert in Rouyn-Noranda. The Corporation inserts at regular intervals quality control (QC) samples (blanks and reference materials) to monitor laboratory performance. Cross check assays are done on a regular basis in a second accredited laboratory.

About Richmont Mines Inc.

Richmont Mines currently produces gold from the Island Gold Mine in Ontario, and the Beaufor Mine in Quebec. The Corporation is also advancing development of the significant high-grade resource extension at depth of the Island Gold Mine in Ontario. With more than 35 years of experience in gold production, exploration and development, and prudent financial management, the Corporation is well-positioned to cost-effectively build its Canadian reserve base and to successfully enter its next phase of growth.

Forward-Looking Statements

This news release contains forward-looking statements that include risks and uncertainties. When used in this news release, the words "estimate", "project", "anticipate", "expect", "intend", "believe", "hope", "may", "objective" and similar expressions, as well as "will", "shall" and other indications of future tense, are intended to identify forward-looking statements. The forward-looking statements are based on current expectations and apply only as of the date on which they were made. Except as may be required by law or regulation, the Corporation undertakes no obligation and disclaims any responsibility to publicly update or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise.

The factors that could cause actual results to differ materially from those indicated in such forward-looking statements include, without limitation, changes in the prevailing price of gold, the Canadian-United States exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and production costs. Other factors such as uncertainties regarding government regulations and the failure of our exploration drilling programs to identify significant new resources or targets or expand existing resources could also affect the results. Other risks may be set out in Richmont's Annual Information Form, Annual Reports and periodic reports. The forward-looking information contained herein is made as of the date of this news release.

Cautionary note to US investors concerning resource estimates

Information in this press release is intended to comply with the requirements of the Toronto Stock Exchange and applicable Canadian securities legislation, which differ in certain respects with the rules and regulations promulgated under the United States Securities Exchange Act of 1934, as amended ("Exchange Act"), as promulgated by the United States Securities and Exchange Commission (the "SEC"). The requirements of NI 43-101 adopted by the Canadian Securities Administrators differ significantly from the requirements of the SEC.

U.S. Investors are urged to consider the disclosure in our annual report on Form 40-F, File No. 001-14598, as filed with the SEC under the Exchange Act, which may be obtained from us (without cost) or from the SEC's web site: http://sec.gov/edgar.shtml.

Tables of Drill Results



TABLE 1

DEEP DRILLING PROGRAM - EXPLORATION AND 
INFILL

Vertical

depth

of
Uncut         
intersec
Length    From      To    True Width  Grade   Cut 
Grade            tion
Hole Number (metres) (metres) (metres)  (metres)  (g/t Au) (g/t 
Au)    Zone   (metres)
MH1-11     1,574   1,265.20 1,267.57    1.25      4.33     4.33
H      1,146
MH1-11             1,329.10 1,331.50    1.28     20.88     
20.78    X[(1)]   1,206
including           1,329.40 1,329.70    0.16     70.77     
70.00
MH1-11             1,396.00 1,400.50    2.71      0.72     0.72
C      1,270
MH2A-11    1,577   1,413.65 1,416.60    2.12      0.09     0.09
E1E     1,283
MH2A-12    1,613   1,416.40 1,428.10    9.42     23.23     
11.67     E1E     1,297
including           1,419.50 1,420.90    1.13     143.38    
43.73
MH2A-12            1,456.90 1,458.80    1.53     93.04     
17.55      X      1,330
including           1,457.50 1,457.80    0.24     548.10    
70.00
MH2A-13    1,739   1,453.40 1,461.60    6.39      8.86     8.86
E1E     1,341
MH2A-13            1,608.40 1,622.70   11.25      2.65     2.65
X      1,492
MH5-4     1,625   1,139.61 1,140.32    0.43      9.65     9.65
X      1,005
MH5-4             1,424.24 1,427.82    2.53      0.87     0.87
C      1,263
MH5-4             1,491.17 1,491.83    0.47     109.22    
42.75      X      1,322
including           1,491.50 1,491.83    0.24     202.94    
70.00
MH-7      1,883   1,291.60 1,293.70    1.68     17.85     
17.85      X      1,082
including           1,293.10 1,293.40    0.24     68.57     
68.57
MH-7              1,476.00 1,480.00    3.53      2.35     2.35
C      1,228
MH8-1C     1,583   1,407.70 1,412.00    3.01      0.62     0.62
E1E     1,252
MH8-2     1,658   1,416.90 1,423.90    6.42      0.99     0.99
E1E     1,281
MH8-3B     1,646   1,386.00 1,390.20    2.67      1.42     1.42
E1E     1,214
MH8-4     1,658   1,441.80 1,451.80    8.40     32.41     
19.85     E1E     1,303
including           1,443.70 1,444.30    0.50     71.76     
70.00
including           1,446.50 1,447.20    0.59     141.43    
70.00
including           1,448.85 1,449.15    0.25     318.28    
70.00
High-grade capping values:
Lower Island C Zone (225 g/t Au), B Zone (60 g/t Au)
Lower X2-E1E Zone. East Lateral E1E Zone and X Zone (70 g/t Au)
(1) X Zone correspond to presently undefined mineralized zone


TABLE 2

EASTERN LATERAL INFILL AND EXPLORATION 
DRILLING

Vertical

depth

of
Uncut         
intersec
Length    From      To    True Width  Grade   Cut 
Grade            tion
Hole Number (metres) (metres) (metres)  (metres)  (g/t Au) (g/t 
Au)    Zone   (metres)
340-586-10    111     82.60    86.23      3.42      8.62     8.62
E1E      301
including            83.00    83.50      0.47     46.18     
46.18
340-586-11    120     93.00    96.13      2.71     12.63     
12.63     E1E      322
including            93.40    93.90      0.43     63.60     
63.60
340-586-12    135     101.80   105.00     2.58     17.10     
12.55     E1E      336
including            102.80   103.30     0.40     99.12     
70.00
340-586-14    192     144.60   148.90     2.53     10.90     9.98
E1E      392
including            146.10   146.50     0.24     79.95     
70.00
340-588-27    120     93.60    96.40      2.72      8.76     8.76
E1E      300
340-588-30    186     139.00   143.40     2.91     26.76     
14.15     E1E      376
including            143.00   143.40     0.26     208.80    
70.00
340-588-31    207     153.70   158.00     2.27     48.01     
12.02     E1E      394
including            156.90   157.50     0.32     327.95    
70.00
340-588-38    207     157.00   161.50     2.30      6.25     6.25
E1E      397
340-588-39    222     173.80   178.40     2.07      8.38     8.38
E1E      414
340-588-40    246     194.00   199.80     2.40     98.85     
23.10     E1E      435
including            194.40   196.60     0.80     257.09    
57.38
340-588-44    168     125.30   129.50     2.80      8.05     8.05
E1E      356
340-588-45    189     140.50   144.70     2.59     18.83     
14.71     E1E      374
including            140.50   140.90     0.25     113.25    
70.00
340-588-46    210     156.00   160.40     2.46     30.05     7.24
E1E      394
including            156.70   157.00     0.17     404.54    
70.00
340-588-47    231     176.40   181.40     2.18     16.79     
16.08     E1E      415
including            179.90   180.20     0.13     81.77     
70.00
340-588-50    126     110.70   114.80     3.00     13.58     
12.52     E1E      321
including            111.20   111.90     0.51     71.02     
64.80
340-588-52    207     164.40   170.30     2.35     16.16     
16.16     E1E      397
GD-640-05-2  1,332   1,090.00 1,095.00    3.17      1.91     1.91
E1E     1,039
GD-640-05-3  1,537   1,061.30 1,065.80    2.21      4.62     4.62
E1E      990
GD-640-05-3          1,086.10 1,091.30 5.20 c.l.   13.81     
13.81      X      1,012
including           1,086.10 1,087.50 1.40 c.l.   35.26     
35.26
GD-640-05-3          1,119.15 1,120.70    0.77     69.41     
29.47      X      1,039
including           1,119.60 1,120.20    0.30     173.18    
70.00
GD-640-05-3          1,246.15 1,248.30    1.08      6.49     6.49
X      1,151
GD-640-05-4  1,484   1,036.35 1,042.85    3.52      0.22     0.22
E1E      972
GD-640-05-5  1,547   1,121.15 1,121.95    0.43     216.04    
58.34     E1E     1,062
including           1,121.15 1,121.65    0.27     322.32    
70.00
GD-670-01   1,052    744.77   746.08     1.02      8.61     8.61
X       600
GD-670-01            761.95   763.57     1.34      5.10     5.10
X       614
GD-670-01            831.10   834.00     2.44      4.17     4.17
E1E?     670
GD-670-02   1,163    695.85   712.50    12.82      0.77     0.77
X       606
GD-670-03    973     781.20   782.20     0.87      1.48     1.48
X       588
GD-690-01   1,007    739.15   740.15     0.89     15.39     
15.39     E1E?     530
GD-690-02    812     473.50   475.40     1.83      4.22     4.22
X       284


TABLE 3

INFILL DELINEATION IN PEA AREA

(ONLY RESULTS ABOVE 6 G/T ARE PRESENTED)

Vertical

depth

of
Uncut         
intersec
Length    From      To    True Width  Grade   Cut 
Grade            tion
Hole Number (metres) (metres) (metres)  (metres)  (g/t Au) (g/t 
Au)    Zone   (metres)
740-465-25    231     188.60   194.20     4.90     261.46    
39.96      X       656
including            189.00   193.10     3.59     356.78    
54.24
740-465-29    261     107.00   109.50     2.41     17.49     
17.49      D       716
740-465-29            168.00   171.40     3.16     11.72     
11.72      X       694
740-465-29            204.60   209.10     4.19     126.54    
21.59      X       681
including            204.60   205.40     0.74     660.31    
70.00
740-465-31    201     145.00   150.00     4.62      6.71     6.71
C       799
740-465-32    222     173.40   176.00     2.27      6.66     6.66
B       836
740-465-39    399     244.90   258.50     2.78      6.84     6.84
C       957
including            249.10   249.80     0.14     100.18   
100.18
740-465-40    402     314.10   322.90     1.92     51.76     
31.80      C      1,017
including            321.20   322.20     0.22     400.63   
225.00
785-487-08    186     129.80   133.10     2.15      7.28     7.28
C       849
785-487-20    114     78.00    81.30      3.18     41.47     
29.51      D1      746
including            79.50    81.30      1.73     73.79     
51.85
785-487-21    111     76.50    81.60      4.81      7.33     7.33
D1      743
800-494-02    196     153.37   159.00     3.02     14.84     
14.84      C       918
including            153.37   153.90     0.28     144.58   
144.58
800-498-03    249     129.00   136.20     2.91      7.30     7.30
D1      910
820-519-01    165     132.80   135.11     2.16     99.55     
10.80      X       797
including            134.17   134.48     0.29     731.32   
225.00
820-520-04    174     156.80   171.00     6.62     45.70     
22.58      C       860
including            157.43   158.63     0.56     498.59   
225.00
820-520-10    198     169.60   179.40     6.63     31.83     
27.50      C       876
including            169.90   171.90     1.35     127.38   
106.17
820-520-11    195     155.00   162.30     5.34     24.50     
24.50      C       860
including            155.00   155.60     0.44     214.97   
214.97
820-520-12    252     207.60   213.00     4.40      6.97     6.97
C       925
820-520-12    252     216.70   221.00     3.50      7.39     7.39
X       930
840-504-01    180     154.20   157.40     2.64     12.46     
12.46      X       871
840-504-08    186     114.00   123.00     6.31     15.76     
11.00      C       868
including            117.60   117.90     0.21     367.92   
225.00
840-504-08            135.00   138.80     2.86     95.39     
10.33      B       873
including            136.40   137.00     0.45     598.72    
60.00
840-504-08            160.70   167.70     5.61     15.44     
12.51      G1      882
including            165.90   167.70     1.44     50.55     
39.18
840-504-09    210     172.40   175.32     2.43     11.03     9.68
G       918
840-504-10    250     235.40   241.00     3.01     19.80     6.77
G      1,005
including            235.80   236.20     0.21     222.38    
40.00
840-513-01    102     81.00    88.20      5.49     34.58     
34.58      C       854
including            82.10    82.52      0.32     163.92   
163.92
including            83.48    83.80      0.24     132.86   
132.86
860-509-01    132     73.90    77.00      2.55     43.76     
26.24      C       867
including            75.90    76.20      0.25     406.05   
225.00
860-509-01            97.90    101.10     3.11     11.94     6.46
B       867
including            98.20    98.50      0.29     118.46    
60.00
860-509-02    135     89.50    95.50      4.08     13.59     
13.59      C       889
including            94.80    95.20      0.27     116.26   
116.26
860-509-04    138     59.85    64.70      4.73     65.07     
52.29      C       845
including            60.55    61.00      0.44     187.78   
187.78
including            61.70    62.00      0.29     431.69   
225.00
860-509-05    106     56.80    66.40      9.29     22.36     
19.77      C       856
including            57.55    58.25      0.68     260.44   
225.00
860-509-05    106     102.70   106.00     3.19     24.61     
21.45      G       852
860-509-06    135     78.00    83.00      3.31     13.50     
13.50      C       876
including            81.80    82.10      0.20     175.82   
175.82
860-509-07    135     96.50    102.75     4.84      7.00     7.00
C       897
860-509-13    171     137.65   141.00     2.66     30.27     7.13
G       938
including            138.88   139.35     0.37     204.93    
40.00
860-511-01    120     85.00    87.75      2.27      7.36     7.36
B       890
860-511-02     78     49.83    54.00      3.75     55.50     
40.64      C       857
including            50.27    50.75      0.43     354.14   
225.00
860-511-02            69.74    73.00      3.03     13.31     
10.68      B       854
860-511-03    114     64.14    71.24      4.98     37.76     
37.09      C       880
including            68.12    68.66      0.38     233.72   
225.00
860-511-05     75     44.00    49.00      4.88     68.26     
57.04      C       845
including            45.90    47.25      1.32     116.36   
116.36
including            47.80    48.10      0.29     412.01   
225.00
860-511-05            66.00    69.00      2.99     34.55     
24.87      B       837
860-511-06     99     47.80    57.00      8.37     63.73     
39.96      C       858
including            47.80    49.00      1.09     407.24   
225.00
including            53.90    54.20      0.27     128.12   
128.12
860-511-06            71.00    74.00      2.95     37.24     6.31
B       856
including            72.70    73.00      0.30     369.36    
60.00
860-511-07    111     61.70    66.50      3.54     99.05     
51.02      C       878
including            62.03    62.40      0.27     206.16   
206.16
including            63.93    64.57      0.47     585.26   
225.00
860-517-01            80.20    85.00      4.01     21.75     
21.75      C       849
860-517-03    108     85.90    97.30      6.80     48.52     
28.50      C       861
including            85.90    86.90      0.60     453.23   
225.00
including            87.90    88.20      0.18     213.94   
213.94
860-517-04    126     102.50   108.00     4.65     11.06     
11.06      C       886
860-517-05    120     79.90    87.00      5.82     59.28     
21.47      C       857
including            80.50    81.00      0.41     761.97   
225.00
860-517-06    126     95.20    102.50     5.21     31.39     
27.00      C       883
including            95.80    96.10      0.21     331.89   
225.00
including            99.10    99.40      0.21     224.23   
224.23
860-517-07    153     107.60   115.50     4.99     88.16     
52.09      C       898
including            107.60   108.40     0.51     546.83   
225.00
including            110.40   110.70     0.19     316.57   
225.00
including            112.40   112.70     0.19     120.58   
120.58
860-517-08    159     88.90    92.90      3.27     45.20     
45.20      C       873
including            89.00    89.70      0.57     117.74   
117.74
including            90.00    90.35      0.29     147.22   
147.22
Media Contacts:

Renaud Adams

President and CEO

Phone: 416-368-0291 ext. 101
Anne Day

Senior Vice-President, Investor Relations

Phone: 416-368-0291 ext. 105

Weitere Storys: Richmont Mines
Weitere Storys: Richmont Mines
  • 17.07.2017 – 12:31

    Richmont Mines Announces Details for the Second Quarter 2017 Financial Results Release

    Toronto (ots/PRNewswire) - Richmont Mines Inc. (TSX: RIC) (NYSE: RIC) ("Richmont" or the "Corporation"), announces the release of its second quarter 2017 financial results before the markets open on Thursday, August 3, 2017. On the same morning at 8:30 a.m. E.T., senior management will discuss the results in a conference call and webcast. Webcast access ...

  • 14.07.2017 – 01:06

    Richmont Files Technical Report for the Island Gold Mine

    Toronto (ots/PRNewswire) - TSX - NYSE: RIC Richmont Mines Inc. (TSX: RIC) (NYSE: RIC) ("Richmont" or the "Corporation"), announced the filing of a Technical Report for the Island Gold Mine with respect to the Expansion Case Preliminary Economic Assessment announced on May 29, 2017. The Technical Report supports the scientific and technical disclosure in that press release. The Technical Report is available at ...

  • 13.07.2017 – 12:31

    Richmont Mines Reports Strong Operational Second Quarter

    Toronto (ots/PRNewswire) - Island Gold Mine Delivers Solid Production and Records Low Cash Costs of US$431 per ounce; On-Track to Meet or Exceed Annual Guidance Richmont Mines Inc. (TSX: RIC) (NYSE: RIC) ("Richmont" or the "Corporation"), reports strong second quarter results with company-wide production of 31,249 ounces of gold, at cash costs1 of $725 (US$539) per ounce. The strong operational performance was driven by ...