Tous Actualités
Suivre
Abonner BKW Energie AG

BKW Energie AG

Mühleberg nuclear power plant
Annual maintenance outage begins

Bern (ots)

BKW shut down the Mühleberg nuclear power plant (KKM) yesterday for scheduled maintenance work and refuelling to take place. The work will take about four weeks.

Extensive internal and external testing of the reactor pressure vessel, preventive electrical and mechanical maintenance as well as the periodic testing of components, fittings and systems are the priorities this year. In addition, 36 of the 240 fuel assemblies will be exchanged and six of the 57 control rod drives will be replaced.

The 345 KKM employees will be assisted by about 700 external specialists from the region, from elsewhere in Switzerland and from abroad. The Swiss Federal Nuclear Safety Inspectorate (ENSI) will carry out a number of on-site inspections during this time.

The start of the maintenance outage marks the end of the 41st operating cycle of the KKM, which is notable for high availability and energy production.

Contact:

Murielle Clerc
medien@bkw.ch
058 477 51 07

Plus de actualités: BKW Energie AG
Plus de actualités: BKW Energie AG
  • 18.07.2014 – 07:00

    Group strategy / BKW takes further step in implementation of its strategy

    Bern (ots) - BKW is planning to transfer its shareholding in swissgrid to a wholly-owned subsidiary. As part of a minority shareholding, CSA Energy-Infrastructure Switzerland, an investment group exclusively for Swiss pension funds managed by Credit Suisse Energy Infrastructure Partners AG, intends to acquire a 49.9 per cent stake in this subsidiary. BKW also aims to ...

  • 25.06.2014 – 17:47

    Decommissioning and Waste Disposal Fund / Annual contributions set to rise

    Bern (ots) - The Federal Council has enacted an amendment to the parameters for calculating contributions to the Decommissioning and Waste Disposal Fund as part of a revision of the Stilllegungs- und Entsorgungsfondsverordnung (SEFV; Ordinance on the Decommissioning and Waste Disposal Fund). The decision means that BKW will have to pay much higher contributions to the ...

  • 26.05.2014 – 17:35

    Swissgrid / BKW reviews its stake in swissgrid

    Bern (ots) - BKW is reviewing a sale of its shareholding in swissgrid Ltd., in which it holds a 12.6% stake. The review aims to further increase BKW's financial flexibility. It is being carried out in view of BKW's strategic realignment from energy supplier to integrated energy service provider. Contact: Antonio Sommavilla media@bkw.ch ...