Mühleberg Nuclear Power Plant / Emergency shutdown due to faulty controller in feedwater system B
Bern (ots) - On 6 July 2015 at 11.03 a.m., there was a controller failure in strand B of the feedwater system. This led to an automatic reactor scram. The cause of the failure is currently being clarified. The reactor is in a safe state. No increased radioactivity was released. The competent authority, the Swiss Federal Nuclear Safety Inspectorate ENSI, was informed ...